Modernization of Swedish Furniture Production, Malacky
Architectural and structural design, Structural design
Slovakia
Malacky
2023
About the Project
The modernization of furniture production involves the construction of new buildings with an area of 35,540 m². The total scope comprises five warehouse and production buildings, three transport bridge structures and five foundation structures for technological sections and retention tanks. The halls are steel-framed, except for the finished goods warehouse which has reinforced concrete columns. The load-bearing structure of the halls consists of transverse frames with truss girders and a purlin-free roof system.
Modernization of Swedish furniture production, Malacky
Detailed design, Workshop documentation of steel structures, Coordination of detailed design
Project Details
Ing. Juraj Šinka, Ing. arch. Peter Guga
36 700 m²
37 100 m²
340 000 m³
1 905 m³
1 408 t